|
|
|
|
|
|
Study of the Conceptual Plan for Thilawa SEZ (T-SEZ) , Myanmar. |
|
Study and Detailed Design of Drainage, Water Supply Distribution, and Wastewater Collection System in Hemaraj - Esie (Rayong) |
|
|
|
|
|
|
|
|
|
Study and Detailed Design of Drainage, Water Supply Distribution, and Wastewater Collection System in ESIE (Rayong) |
|
Study of the Water Supply System in Rayong Industrial Land (RIL). |
|
|
|
|
|
|
|
|
|
Study and Detailed Design of the Raw Water System and Holding Pond in Hemaraj Eastern Industrial Estate (EIE) |
|
Study and Detailed Design of Utilities in Saraburi Industrial Land (SIL) |
|
|
|
|
|
|
|
|
|
Study of the Improvement of the Water Supply System in Hemaraj Chonburi Industrial Estate. (CIE) |
|
Conceptual Design of Cha Am Resort Project |
|
|
|
|
|
|
|
|
|
Study of the Improvement of the Water Supply System in Asia Industrial Estate. |
|
|